About our District
  Superintendent, Terry Bouck
  School Bond
    PowerPoint Presentation
    Bond Resolution
    Project List by School
  Levy Facts & History
    Statement
    Result History
  Enrollment
  Budget
  Contact Information


Bond

[Bond] [PowerPoint Presentation] [Bond Resolution] [Bond Project List by School]

See Your Bond Dollars at Work:
Bond Projects Photo Album

 

Bond Project Spreadsheet: CapBondPlan.xls

Facts about the School Bond May 20, 2003
APPROVED 8912 / 60.89%    -    REJECTED  5725  / 39.11%

The Capital Projects Bond will:

Fund the plan recommended by the Capital Facilities Task Force

The Peninsula School Board established a community and employee based Capital Facilities Task Force in 2002. This group solicited input throughout the district in order to set the standard for appropriate learning environments in our district, evaluate our existing facilities, and develop a plan to address facility needs. The task force set the following priorities:

  • Enhance building safety and access
  • Extend the physical life of our facilities
  • Ensure educational equity across all schools
  • Enhance instructional and support space

Ensure that all Peninsula schools meet the basic standards set by our community

The proposed bonds focus on the basics. The School Board and Task Force analyzed every project to ensure that they all fit the priorities identified by the community through their input into the strategic plan. They made sure that each project will directly enhance the learning and teaching function of our facilities.

Accountability is built into the plan:

If the proposed Capital Facilities Bond issue is approved, the board will establish two citizen committees to oversee the projects. The Planning and Timelines Committee will work in conjunction with the schools to implement each project while the district Audit Committee will ensure that bond proceeds are spent as promised. Both committees will report regularly to the school board.

The $45-million bond projects are organized in 6 areas which will support all of our students:

Major Facility Modernization
Purdy Elementary, built in 1970, needs to be brought up to current, educationally sound standards. The main building at Harbor Ridge is being replaced now; replacement of the old classroom building and concrete gym will complete the Harbor Ridge project.


Technology, Communications & Electrical Upgrades
Every school will receive upgrades in the areas of technology, communications systems and related infrastructure electrical improvements.


Air Quality & HVAC Upgrades (Heating / Air Conditioning / Ventilation)
New HVAC units and/or centralized control systems will be installed in every building. The sawdust collectors will be replaced at Kopachuck and Key Peninsula.

Replace Portables
Modular buildings will replace all pre-1980 portables.

Modernize Classrooms / Learning Environments
The following upgrades will be accomplished: Gig Harbor High's auditorium and home economics classroom; Peninsula High's library and 100,200, and 300 area classrooms; Gig Harbor and Peninsula pool lockers; Gig Harbor High and Special Programs modular additions/replacements for safety and accessibility; and, Key Peninsula and Kopachuck floor covering replacement.

Energy Upgrades
The boilers at Gig Harbor and Peninsula pools will be replaced with energy-efficient systems.

  2003 2004 2005 2006 2007 2008 2009 2010 2011 2012-19
Previously-Approved Bonds 1.29 1.29 0.96 0.81 0.74 0.66 0.53 0.39 0.19 -0-
                     
Proposed Bonds n/a 0.18 0.51 0.64 0.71 0.79 0.61 0.76 0.50 0.69
                     
Total School Bond Tax Rate 1.29 1.47 1.47 1.45 1.45 1.45 1.14 1.15 0.69 0.69
 
Tax rates are calculated as a dollar amount per thousand dollars of a property's assessed value.

The proposed bonds will be structured around the previously approved bonds to help stabilize property owners' tax rates. As you can see from the chart above, the bond tax rate is expected to increase by 18 cents per thousand dollars of assessed value in 2004, then step down after five years.

For an owner of a $200,000 home, that would equate to an additional $36 per year ($3 per month) over the 2003 school bond tax rates.

Building

Year Originally Built

remodel / modified, add-on

Artondale

1959

67, 78

Discovery

1981

88

Educ Service Center

1962

78, 79

Evergreen

1955

79, 78

Gig Harbor

1979

 

Goodman

1990

 

Harbor Heights

1952

66

Harbor Ridge

1927

68, 74, 75

Henderson Bay

2002

 

Key Peninsula

1981

 

Kopachuck

1982

 

Minter

1983

88

Peninsula High

1962

69, 75, 78, 79, 82, 87

Purdy

1971

 

Vaughn

1955

79

Voyager

1988

 

[home] [about us] [school board] [our school] [learning & teaching] [education programs] [support & operations] [employment]
[calendars] [sitemap] [feedback] [staff intranet] [webmaster]

The Peninsula School District shall provide equal educational opportunity and treatment for all students in all aspects of the academic and activities program without regard to race, creed, color, or national origin, sex, sexual preference, marital status, previous arrest (unless a clear and present danger exists), or incarceration or non-program-related physical, sensory or mental disabilities, as per RCW 49.60 Law Against Discrimination.

Peninsula School District #401 14015 62nd Ave. NW, Gig Harbor, WA  98332 (253) 530-1000 .  Copyright © 2005