Artondale Elementary Replacement

AES

Principal

Jessica Rosendahl

Jessica Rosendahl

Latest News

  • Architectural Firm: Integrus Architecture
  • Consulting firms have been hired to analyze the site in preparation for site and building design.
  • An initial conceptual design was presented to the school board at their June 6th meeting. See the design here.

Project Summary

A new Artondale Elementary containing 30 classrooms in approximately 68,000 sq. ft will be constructed on the current parcel. After construction is complete, the old school will be demolished and the parking area and fields will be reconfigured. The planned opening date for the new school will be fall of 2021.

Project Timeline

  • This project is scheduled to bid in spring 2020.
  • Construction is scheduled to start summer 2020.
  • The new school will open in fall 2021.

Project Management Consultants
Greene Gasaway

Jeff Greene
Calvin Gasaway
Jesse Ahlberg
Sam Rosendahl

Patrick Gillespie
Director of Facilities
(253) 530-3880
gillespiep@psd401.net

Vicki Smith
Capital Projects Coordinator
(253) 530-3880
smithv@psd401.net