  • Architectural Firm: TCF Architecture
  • Consulting firms have been hired to analyze the site in preparation for site and building design.
  • Conceptual design was presented to the school board at their Sept. 12 meeting. See design here See the site plan here.

Project Summary

A new Evergreen Elementary School consisting of 19 classrooms in approximately 45,000 sq. ft will be constructed on the current parcel. After construction is complete, the old school will be demolished and the parking area and fields will be reconfigured. The planned opening date for the new school will be in the fall of 2021.

Project Timeline

  • The project is scheduled to bid in early 2020.
  • Construction is scheduled to start in spring 2020.
  • New school will open in the fall of 2021.

Archives

  • Initial conceptual design was presented to the school board at their June 6th meeting. See the designs here.

Project Management Consultants
Greene Gasaway

Jeff Greene
Calvin Gasaway
Jesse Ahlberg
Sam Rosendahl

Patrick Gillespie
Director of Facilities
(253) 530-3880
gillespiep@psd401.net

Vicki Smith
Capital Projects Coordinator
(253) 530-3880
smithv@psd401.net